A member of the Wire Association International, Inc. since 1972.                           A lifetime member since 2004.
The first requirement for optimized productivity is total process control. This holds true for simple processes, like stringing dies in a drawing machine, changing color in a thermoplastic extruder and for very complex processes like setting up and starting a triple extrusion CV line for manufacturing extra- high voltage cable. There are two equally important components defining total process control and these are: Process Optimization and Process Repeatability
Our in-depth and hands-on Process Engineering experience covers virtually every process in a modern wire and cable plant. Please follow the pull- down menu to review our presently offered Process Engineering services.
A Switchboard Cable Core.